HCCB launches Kinley water production line in Telangana

Hindustan Coca-Cola Beverages (HCCB) has announced the operational commissioning of a Kinley water production line at its Avinya manufacturing facility in Banda Thimmapur.

20 Apr 2026 | By Jiya Somaiya

The facility is located in the Siddipet district of Telangana

Hindustan Coca-Cola Beverages (HCCB)’s installation marks a technical milestone for the Coca-Cola India Southwest Asia (INSWA) system, establishing the line as the fastest of its kind within the regional network.

The Avinya plant, a Greenfield project spanning 49-acres, represents a planned investment exceeding INR 2,000-crore. With the addition of this new line, the facility now operates seven advanced production lines. The site in Telangana complements HCCB’s established operations in Ameenpur and collectively employs over 1,000 individuals across the state.

The facility is capable of producing 500-ml PET bottles at a rate of 1,350 bottles per minute (BPM), while 1-litre bottles can be processed at 1,000 BPM. This capacity is managed through an integrated automation framework and a centralised human-machine interface (HMI), which provides real-time operational visibility and reduces manual intervention in process control.

Sustainability features are integrated directly into the production architecture. The line utilises a water purification system featuring mineral injection and ozonisation, paired with advanced lamella pack technology. This recovery system allows for up to 90% water recovery, a key component of the company’s resource management strategy. 

Furthermore, the line is equipped with energy-optimised hardware designed to minimise downtime during product changeovers and reduce the overall carbon footprint of the bottling process.

Speaking on the commissioning of the new production line, Avinash Kant Kumar, head of integrated supply chain, HCCB, said, “Avinya sets a new national benchmark in beverage manufacturing by merging high-tech automation with sustainable resource management. The launch of our Kinley production line, the fastest in the Coca-Cola INSWA system, marks a big milestone for HCCB. This facility reinforces our commitment to Telangana’s industrial growth and our dedication to world-class operational excellence.”

Latest Poll

What is a top priority for you when you plan a packaging roll-out?

Results

What is a top priority for you when you plan a packaging roll-out?

Material selection

 

50.0%

Over-designing

 

18.75%

Process inefficiency

 

12.50%

Packaging wastage

 

18.75%

Total Votes : 16